REBUILDING SERVICES
CO2 Receiver Rebuilding
Standard Rebuild Includes:
-
Confirm existence of ASME code date plate.
-
Strip to bare tank and prime vesel, saddles, and skid.
-
Replace exisiting evaporator coil with effcient distributor coil.
-
Re-insulate using 4" urethane insulation with aluminum jacket.
-
Re-pipe using Sch. 80 seamless pipe and 2,000# (min) forged steel fittings.
-
New stainless steel ball valves (1ea. LF, VB, LP, VP)
-
New CGA fittings with hose blow-down valves.
-
New dual ASME approved spring loaded safeties
-
New dual bleeders (single on small tanks)
-
New Copeland R-404A condensing unit with new line components.
-
New Cutler Hammer control panel with fused disconnect.
-
New 6" 0 to 600 psi pressure gauge.
-
New Barton or Wika differential pressure indicator
-
New control cabinet with lockable access door.
-
Complete check out with all controls set for proper operation.